Projects
Governmental and Institutional
María Inmaculada Offices
Construction of a new structure, finishes, and general building renovation.
Productos Alimenticios Pascual Plant
Reconditioning Project for the Wastewater and Industrial Water System of the Pascual Food Products Plant. Design of a new system. Excavation and installation of pipelines inside and outside the Pascual food production plant. Construction of pumping pits. Interconnection to the IDAAN line.
Costa Norte Loading Facility (AES) – Telfers Island, Colón
Earthworks, concrete paving, utility corridors, fencing, bolt installation, foundations for the loading facility, and fuel lines.
Planta Toledano – Rana De Oro
Plant expansion. Design and construction of a 1,200 m² warehouse.
Cemento Panamá
New Aggregates Plant for Cemento Panamá, Nuevo San Juan. Foundations for crushed material conveyor belts, foundations for the thickener tank, foundations for the compact plant, foundations for the mechanical installation of primary and secondary crushing warehouses, a 330 m² retaining wall, electrical control room, and raw water tank.
Instituto Profesional Técnico Comercial
Construction of two classroom buildings, an administrative building, and a gymnasium.
Grupo Lavery
Design, development, and approval of plans. Topographic surveying. Construction of a 50,000-gallon aerobic tank. Construction of drying beds for industrial sludge. Conversion of a UASB (upflow anaerobic sludge blanket) tank into a balance tank for industrial flows. Construction of grease traps for the McCormick factory and Lavery plant. Design and construction of a percolation field for domestic wastewater. Reconditioning of existing soil to support new structural loads.
Industrias Lácteas Estrella Azul
Treatment Plant. Demolition, earthworks, construction of building, walls, and tanks.


















































































