Projects
Residencia Sol y Sombra – Casco Antiguo
It consisted of the construction of a new structure, finishes, and general building renovation.
Planta Toledano – Rana De Oro
Plant expansion. Design and construction of a 1,200 m² warehouse.
Cemento Panamá
New Aggregates Plant for Cemento Panamá, Nuevo San Juan. Foundations for crushed material conveyor belts, foundations for the thickener tank, foundations for the compact plant, foundations for the mechanical installation of primary and secondary crushing warehouses, a 330 m² retaining wall, electrical control room, and raw water tank.
Instituto Profesional Técnico Comercial
Construction of two classroom buildings, an administrative building, and a gymnasium.
Hotel Coronado Golf and Resort
Expansion of the Coronado Golf Resort. A major project that included new structure construction, finishes, and electromechanical work.
Grupo Lavery
Design, development, and approval of plans. Topographic surveying. Construction of a 50,000-gallon aerobic tank. Construction of drying beds for industrial sludge. Conversion of a UASB (upflow anaerobic sludge blanket) tank into a balance tank for industrial flows. Construction of grease traps for the McCormick factory and Lavery plant. Design and construction of a percolation field for domestic wastewater. Reconditioning of existing soil to support new structural loads.
Industrias Lácteas Estrella Azul
Treatment Plant. Demolition, earthworks, construction of building, walls, and tanks.
Dos Casas – Casco Antiguo
Construction of the structure, restoration of calicanto walls, finishes, and general building renovation.